Skip to content

STRUCTURE

Blockwork, partition walls and plasterboard builds — Warsaw

We change the layout of a flat and hide what should not be visible: block and stud partitions, boxing-in for risers and concealed frames, suspended ceilings, bespoke recesses and shelves. Wet rooms get moisture-resistant board and the stud cavity is filled with mineral wool.

What the scope includes

02 — STRUCTURE

Blockwork, partitions and plasterboard builds

  • partition walls in silicate block, aerated concrete and brick
  • bricking up redundant openings and recesses
  • plasterboard partitions on a steel stud frame
  • boxing in risers, pipework, ventilation ducts and concealed cisterns
  • boxing in radiators and manifolds with an access panel
  • suspended ceilings, single and multi-level
  • profiles and coves for LED strips and linear lighting
  • bespoke plasterboard recesses, shelves and cabinets
  • moisture-resistant board in wet rooms, fire-rated board where required
  • acoustic insulation inside the stud cavity
  • boxing in loft slopes, knee walls and upstands
  • lintels, angle beads, aluminium corners, taping and filling of joints

How long it takes and what drives the price

Building a partition wall takes 1–3 days plus filling and sanding time. A suspended ceiling in one room takes 2–4 days. Boxing-in a riser with an access panel takes 1–2 days.

Price depends on

  • partition material: silicate, aerated concrete, brick or steel stud
  • area and number of levels in the suspended ceiling
  • profiles and recesses for LED strips
  • acoustic insulation inside the partitions
  • boxing-in loft slopes and knee walls
  • number of corners and joints to be filled

Blockwork and plasterboard builds

Frequently asked questions

CONTACT

Book a free site visit

Leave your details — we will call back and arrange a visit. We answer the phone at weekends too.

Service area
Warszawa · Piaseczno · Pruszków · Ożarów Mazowiecki · Legionowo · Marki · Ząbki · Konstancin
CallWhatsAppQuote