STRIP-OUT

Strip-out, demolition and waste removal — Warsaw

We prepare the property for its new design: stripping tiles and old plaster, demolishing partitions, removing floors, sanitaryware and dead installations. Everything that stays is protected with sheeting, and the rubble is carried out and disposed of — we do not leave bags on the stairwell.

What the scope includes

01STRIP-OUT

Strip-out and preparatory works

  • demolishing partition walls — masonry and plasterboard
  • cutting and widening door and window openings
  • stripping old tiles from walls and floors
  • removing old plaster, skim, wallpaper and flaking paint
  • lifting old floors: laminate, board, parquet, carpet, screed
  • removing old sanitaryware: WC, basins, baths, trays, enclosures
  • removing old kitchen units, wardrobes and built-in joinery
  • removing old electrical and plumbing installations
  • removing door sets together with their frames
  • taking down suspended ceilings and plasterboard builds
  • sheeting windows, doors and every surface that stays
  • carrying out rubble, transport and disposal of construction waste

17HANDOVER

Completion and handover

  • post-renovation cleaning, removing sheeting and protection
  • cleaning windows, frames and sills
  • removing leftover materials and rubble
  • a joint quality inspection and a written snagging list
  • completing the items on the snagging list
  • handing over guarantee documents, product data and instructions

How long it takes and what drives the price

Strip-out in a 5 m² bathroom usually takes 1–2 days. Demolition across a 50–70 m² flat takes 3–7 days. Waste removal is arranged as we go so it never blocks the work front.

Price depends on

  • area to be stripped and thickness of the layers
  • masonry versus plasterboard walls
  • floor level and lift access when carrying rubble out
  • number of skips and disposal cost
  • extent of protection for surfaces that remain
  • removal of old installations and joinery

Strip-out and demolition

Frequently asked questions

CONTACT

Book a free site visit

Leave your details — we will call back within 24 working hours and arrange a visit.

Address
ul. Henryka Dobrzańskiego „Hubala” 22D
01-473 Warszawa
Service area
Warszawa · Piaseczno · Pruszków · Ożarów Mazowiecki · Legionowo · Marki · Ząbki · Konstancin
Opening hours
Mon–Sat, 8:00–19:00
CallWhatsAppQuote