
KITCHENS
Kitchen renovation in Warsaw — from wiring to connected appliances
We prepare the kitchen for its units and finish the job: new circuits for the hob and oven, water and waste points for the sink and dishwasher, splashback, cabinet and worktop installation, appliance connection. The kitchen leaves the renovation ready to cook in, not "almost ready".
What the scope includes
11 — KITCHENS
Kitchens
- fitting kitchen units: base, wall, tall units and islands
- cutting and fitting laminate, timber, composite and stone worktops
- sink and hob cut-outs, sealing the edges
- fitting sink, mixer, trap and soap dispenser
- fitting and connecting appliances: hob, oven, extractor, dishwasher, fridge, microwave
- fitting an extractor, ducted or recirculating
- splashback: tile, toughened glass, stone, laminate
- worktop trims, plinths and silicone sealing
- under-cabinet lighting and in-worktop sockets
- fitting internal systems: pull-outs, drawers, organisers
- adjusting fronts, hinges and drawers after installation
03 — ELECTRICS
Electrical installations
- planning every electrical point with the client, before any chasing
- chasing walls, drilling penetrations, setting back boxes
- running new cable and splitting out circuits
- replacing and extending the consumer unit, fitting breakers and RCDs
- fitting sockets, switches, dimmers and faceplates
- sockets in the kitchen worktop, pop-up and under-counter sockets
- dedicated circuits and connection of induction hob, oven, extractor, dishwasher, washing machine
- ceiling, downlight and track lighting
- LED strips, aluminium profiles, drivers and controllers
- under-cabinet kitchen lighting and mirror backlighting
- fitting lamps, chandeliers, wall lights, flush fittings and pendants
- bathroom fittings at the correct IP rating
- electric underfloor heating with sensor and thermostat
- door entry and video door entry systems
- data cabling: LAN, TV, points behind a wall-mounted television, cables concealed in the wall
- smart home components: relays, controllers, smart switches
- post-installation testing and verification
04 — PLUMBING
Water, waste and heating installations
- running hot and cold water pipework — PEX or copper
- rebuilding and running waste pipework, boxing in risers
- relocating water and waste points: basin, WC, washing machine, dishwasher, fridge
- fitting concealed cisterns and wall-hung WC pans
- fitting basins, baths, shower trays and enclosures
- linear and point drains, forming the falls
- waterproofing beneath tiling — liquid membrane, sealing tapes, matting
- surface-mounted and concealed mixers, shower panels
- connecting washing machine, dishwasher and fridge with ice maker
- fitting sink, kitchen mixer, trap and water filter
- replacing and fitting radiators, including bathroom ladder rails
- wet underfloor heating — loops, manifold, pressure test
- fitting and connecting boilers and instantaneous water heaters
- pressure testing before anything is covered up
How long it takes and what drives the price
A kitchen with no change to the installation layout usually takes 1–2 weeks. A kitchen with relocated plumbing and electrical points plus a new splashback takes 2–4 weeks. Fitting the units and worktop alone takes 2–4 days.
Price depends on
- whether the plumbing and electrical layout changes
- number and type of appliances to connect
- worktop material — laminate, timber, composite or stone
- splashback type: tile, toughened glass, stone
- kitchen island and in-worktop sockets
- under-cabinet lighting and internal cabinet systems
Turnkey kitchens
Frequently asked questions
CONTACT
Book a free site visit
Leave your details — we will call back within 24 working hours and arrange a visit.
- Phone
- +48 881 596 763
- dskoptima@gmail.com
- Address
- ul. Henryka Dobrzańskiego „Hubala” 22D
01-473 Warszawa - Service area
- Warszawa · Piaseczno · Pruszków · Ożarów Mazowiecki · Legionowo · Marki · Ząbki · Konstancin
- Opening hours
- Mon–Sat, 8:00–19:00