
BATHROOMS
Bathroom renovation in Warsaw — complete, from the ground up
We run a bathroom renovation from stripping the old tiles to connecting the last tap. One crew handles demolition, installations, waterproofing, surfaces and fit-out — we do not hand the site over to further subcontractors and we do not disappear between stages.
What the scope includes
12 — BATHROOMS
Bathrooms from the ground up
- setting out the layout, demolition and new partitions
- relocating water, waste and electrical points
- waterproofing and forming the falls
- concealed cistern frame, boxing in the risers
- surfaces: tile, natural stone, microcement
- shower enclosure, bath, tray, linear or point drain
- fitting sanitaryware: WC, bidet, basin, vanity top
- surface-mounted and concealed mixers, rain showers, shower panels
- bathroom cabinets, mirrors and LED-backlit mirrors
- ladder radiator and underfloor heating
- mechanical ventilation, lighting and sockets at the correct IP rating
- accessories: hooks, handles, rails, dispensers, trims
- silicone work and finishing of all joints
04 — PLUMBING
Water, waste and heating installations
- running hot and cold water pipework — PEX or copper
- rebuilding and running waste pipework, boxing in risers
- relocating water and waste points: basin, WC, washing machine, dishwasher, fridge
- fitting concealed cisterns and wall-hung WC pans
- fitting basins, baths, shower trays and enclosures
- linear and point drains, forming the falls
- waterproofing beneath tiling — liquid membrane, sealing tapes, matting
- surface-mounted and concealed mixers, shower panels
- connecting washing machine, dishwasher and fridge with ice maker
- fitting sink, kitchen mixer, trap and water filter
- replacing and fitting radiators, including bathroom ladder rails
- wet underfloor heating — loops, manifold, pressure test
- fitting and connecting boilers and instantaneous water heaters
- pressure testing before anything is covered up
08 — STONE
Tiling and natural stone
- laying ceramic and porcelain tiles on walls and floors
- large-format tiles, up to 120×280 cm
- mosaic, metro, decorative and textured tiles
- herringbone, brick bond and other patterns
- grouting, silicone, trims and corner profiles
- damp-proofing beneath bathroom surfaces
- laying travertine, marble and granite — walls, floors, stairs
- stone on terraces, balconies and external steps
- stone sills, worktops and plinths — cutting and fitting
- grinding, polishing, sealing and maintenance of stone
- clinker, facade tiles and decorative brick
How long it takes and what drives the price
A standard 4–6 m² bathroom takes 2–4 working weeks. A bathroom with natural stone, large-format slabs or relocated plumbing risers takes 4–6 weeks. The deadline goes into the contract before work starts.
Price depends on
- floor area and number of sanitary rooms
- scope of demolition and relocation of water and waste points
- surface type: porcelain, natural stone, microcement
- tile format — large-format slabs take more work than 60×60
- underfloor heating and mechanical ventilation
- standard of fittings, ceramics and lighting
Bathrooms from the ground up
Frequently asked questions
CONTACT
Book a free site visit
Leave your details — we will call back within 24 working hours and arrange a visit.
- Phone
- +48 881 596 763
- dskoptima@gmail.com
- Address
- ul. Henryka Dobrzańskiego „Hubala” 22D
01-473 Warszawa - Service area
- Warszawa · Piaseczno · Pruszków · Ożarów Mazowiecki · Legionowo · Marki · Ząbki · Konstancin
- Opening hours
- Mon–Sat, 8:00–19:00